Active Reach: 2_7 House Creek
Bank Erosion Stability | Bank Vegetation | In Stream Cover | Riffles Pools Bends | Verge Vegetation | |
---|---|---|---|---|---|
July 2006 | Fair | Good | Poor | Fair | Good |
habitat conducted at bridge where concrete bridge pylons and concrete through-fare make up part of the banks with rock armouring. Bridge shading areas. Plenty of rubbish from stormwater drains. |
Date | Taxa Count | Total score | Rating |
---|---|---|---|
September 2002 | 22 | 9 | |
August 2002 | 3 | N/A | |
June 2002 | 3 | N/A | |
May 2002 | 67 | 3 | |
September 1999 | 10 | 28 |
Dissolved Oxygen mg/LExplain for me 28-05-1999 to 03-08-2000
N/A mg/L
Median 8.00mg/L Latest |
Temperature - WATERExplain for me 28-05-1999 to 16-07-2008
11.4 ° C
Median 12.5° C Latest |
pHExplain for me 28-05-1999 to 16-07-2008
6.50 pH Units
Median 7.00pH Units Latest |
Electrical ConductivityExplain for me 28-05-1999 to 16-07-2008
247.00 µS/cm
Median 260.00µS/cm Latest |
Reactive Phosphate (mg/L)Explain for me 28-05-1999 to 16-07-2008
0.060 mg/L P
Median 0.080mg/L P Latest |
Dissolved Oxygen % SaturationExplain for me 28-05-1999 to 16-07-2008
65 %
Median 77% Latest |
Turbidity - NTUExplain for me 28-05-1999 to 16-07-2008
13 NTU
Median 13NTU Latest |