Skip to content
 
WaterWatch Data Portal

NC_CRE700 Loddon River Catchment

Creswick Creek Sub Catchment

Active Reach: 7_20 Creswick Creek

Physical Chemical Tests

Site Visits
Trend Line
Temperature - WATER
Explain for me 12-03-2009 to 22-09-2026
14.5 ° C
Median
14.0° C
Latest
pH
Explain for me 12-03-2009 to 22-09-2026
7.70 pH Units
Median
8.40pH Units
Latest
Electrical Conductivity
Explain for me 12-03-2009 to 22-09-2026
1262.00 µS/cm
Median
568.00µS/cm
Latest
Reactive Phosphate (mg/L)
Explain for me 12-03-2009 to 22-09-2026
0.005 mg/L P
Median
0.010mg/L P
Latest
Turbidity - NTU
Explain for me 12-03-2009 to 22-09-2026
9 NTU
Median
9NTU
Latest
View all site visits
Diary entries
Edges and planted slope washed away at usual test site

September 2026

NC-CRE 700 Shallow Test Site

September 2026

Landcare new plantings

June 2026

June 2026

NC-CRE700 Lots of surface Scum and froth, Clung to pole.

April 2026

Murky water with lots of plant debris. 3.4mm rain earlier in week.

March 2026

NC-CRE700

February 2026

NC-CRE700. Oily scum widespread mostly along banks. Sitting there, no flow.

February 2026

NC_CRE700

January 2026

NC_CRE700

January 2026

Thigh high grass to get to NC-CRE700

November 2025

Thigh high grass to get to NC-CRE700

November 2025

NC-CRE700

November 2025

NC_CRE700

September 2025

NC_CRE700

September 2025

New spot to last month … closer to official map indication

August 2025

Next site visit will be further upstream as per the site description.

July 2025