North East
DOWNLOAD DATARock works on opposite side with very little erosion occurring (only occurring in one spot- close to footbridge)Park adjacent to site on west bank, road on east bank. 2 stormwater drains; one on each side of the creek. Rubbish and trolley in creek.
Bank Erosion Stability | Bank Vegetation | In Stream Cover | Riffles Pools Bends | Verge Vegetation | Overall |
---|---|---|---|---|---|
Poor 2 | Fair 6 | Fair 6 | Fair 3 | Good 8 | Fair 25 |