Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
South Gippsland Catchment
WG_TRR001
Site visits
06-11-1997
Tarra River, Baxters Road. NCI Project
West Gippsland
DOWNLOAD DATA
WG_TRR001 South Gippsland Catchment
Thursday 6th November 1997 8:45am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
140
µS/cm
pH
7.17
pH Units
Reactive Phosphate (mg/L)
0.03
mg/L P
Total Dissolved Solids
50
mg/L
Total Phosphorus
0.07
mg/L P
Turbidity - NTU
4
NTU
Water Conditions
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Water Bugs
WaterWatch method
Image
Species
Score
Quantity
Total bug score
Total abundance
0 - 35
35+
0 - 200
Poor
Good
200+
Fair
Very good
Total abundance: 0
Total score: 0
Overall rating: Poor
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Total Dissolved Solids
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Turbidity - NTU
Test 2
Total Dissolved Solids
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
06-11-1997
19-11-1997
→
Modal title