Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
South Gippsland Catchment
WG_BNN010
Site visits
02-07-2008
Bennison Creek lower. NCI Project
West Gippsland
DOWNLOAD DATA
WG_BNN010 South Gippsland Catchment
Wednesday 2nd July 2008 10:10am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
501
µS/cm
pH
6.54
pH Units
Reactive Phosphate (mg/L)
0.063
mg/L P
Temperature - AIR
11.1
° C
Temperature - WATER
9.7
° C
Total Phosphorus
0.093
mg/L P
Turbidity - NTU
8.75
NTU
Water Conditions
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Water Bugs
WaterWatch method
Image
Species
Score
Quantity
Total bug score
Total abundance
0 - 35
35+
0 - 200
Poor
Good
200+
Fair
Very good
Total abundance: 0
Total score: 0
Overall rating: Poor
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Hardness
Total Dissolved Solids
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Hardness
Total Dissolved Solids
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
25-06-2008
02-07-2008
09-07-2008
→
Modal title