Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Bunyip River Catchment
ME_EWA080
Site visits
30-09-2010
Warringine Creek downstream of Henderson/Boes Rd bridge
Melbourne
DOWNLOAD DATA
ME_EWA080 Bunyip River Catchment
Thursday 30th September 2010 13:10pm
Approved
Notes
Physical Chemical Tests
Ammonia-Nitrogen
mg/L
Dissolved Oxygen mg/L
mg/L
Electrical Conductivity
2100
µS/cm
Filterable Reactive Phosphorus
0.07
mg/L P
Nitrate - Nitrogen
mg/L
pH
7.1
pH Units
Temperature - AIR
15.4
° C
Temperature - WATER
11.4
° C
Turbidity - NTU
10
NTU
Water Conditions
Weather
Cloudy
Last rainfall
Last 24 hrs
Flow estimate
Normal base flow
Water Appearance
Stream depth
17.00
Stream width
8.00
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Ammonia-Nitrogen
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Ammonia-Nitrogen
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
28-08-2010
30-09-2010
27-10-2010
→
Modal title