Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Mallee Catchment
MA_RMU541
Site visits
05-06-2011
River Murray at Pump Hill boat ramp
Mallee
DOWNLOAD DATA
MA_RMU541 Mallee Catchment
Sunday 5th June 2011 9:45am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
160
µS/cm
pH
7.6
pH Units
Reactive Phosphate (mg/L)
0.05
mg/L P
Temperature - WATER
12.7
° C
Turbidity - NTU
40
NTU
Water Conditions
Weather
Last rainfall
During the last week
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Turbidity - NTU
Test 2
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
03-05-2011
05-06-2011
02-07-2011
→
Modal title