Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Mallee Catchment
MA_PFO600
Site visits
07-08-2010
Foster Street Settling pond rehabilitation site 2
Mallee
DOWNLOAD DATA
MA_PFO600 Mallee Catchment
Saturday 7th August 2010 8:30am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
319
µS/cm
pH
7.6
pH Units
Reactive Phosphate (mg/L)
0.25
mg/L P
Temperature - WATER
7.9
° C
Turbidity - NTU
10
NTU
Water Conditions
Weather
Last rainfall
During the last week
4.4
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
06-06-2010
07-08-2010
04-09-2010
→
Modal title