Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Mallee Catchment
MA_PFO600
Site visits
14-08-2011
Foster Street Settling pond rehabilitation site 2
Mallee
DOWNLOAD DATA
MA_PFO600 Mallee Catchment
Sunday 14th August 2011 10:00am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
750
µS/cm
pH
7.3
pH Units
Reactive Phosphate (mg/L)
0.6
mg/L P
Temperature - WATER
11.5
° C
Turbidity - NTU
20
NTU
Water Conditions
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
17-07-2011
14-08-2011
11-09-2011
→
Modal title