Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Mallee Catchment
MA_PFO600
Site visits
13-06-2011
Foster Street Settling pond rehabilitation site 2
Mallee
DOWNLOAD DATA
MA_PFO600 Mallee Catchment
Monday 13th June 2011 9:00am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
751
µS/cm
pH
7.4
pH Units
Reactive Phosphate (mg/L)
0.6
mg/L P
Temperature - WATER
8.2
° C
Turbidity - NTU
27
NTU
Water Conditions
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
14-05-2011
13-06-2011
17-07-2011
→
Modal title