Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Mallee Catchment
MA_CSA850
Site visits
26-12-2011
Site A - Riverside (15th Tee)
Mallee
DOWNLOAD DATA
MA_CSA850 Mallee Catchment
Monday 26th December 2011 10:10am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
481
µS/cm
pH
7.2
pH Units
Reactive Phosphate (mg/L)
0.08
mg/L P
Temperature - WATER
23.7
° C
Turbidity - NTU
13
NTU
Water Conditions
Weather
Overcast
Last rainfall
During the last 24 hours
Flow estimate
Water Appearance
Clear,Stained brown
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Total Dissolved Solids
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Total Dissolved Solids
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
12-12-2011
26-12-2011
09-01-2012
→
Modal title