Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Broken River Catchment
GB_BOO010
Site visits
17-03-2011
Boosey Creek at Katamatite behind the driver's rest area.
Goulburn-Broken
DOWNLOAD DATA
GB_BOO010 Broken River Catchment
Thursday 17th March 2011 13:20pm
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
74
%
Dissolved Oxygen mg/L
5.9
mg/L
Electrical Conductivity
99
µS/cm
pH
7.4
pH Units
Temperature - WATER
21.5
° C
Total Phosphorus
0.27
mg/L
Turbidity - NTU
105
NTU
Water Conditions
Weather
Last rainfall
During the last 24 hours
0
Flow estimate
Moderate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Rainfall last 48 hours
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Rainfall last 48 hours
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
25-02-2011
17-03-2011
21-04-2011
→
Modal title