Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Loddon River Catchment
NC_CRO900
Site visits
09-01-2012
Jim Crow Creek upstream from Garsed Road crossing
North Central
DOWNLOAD DATA
NC_CRO900 Loddon River Catchment
Monday 9th January 2012 11:15am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
390
µS/cm
pH
7.5
pH Units
Reactive Phosphate (mg/L)
0.2
mg/L P
Temperature - AIR
20
° C
Temperature - WATER
19.8
° C
Turbidity - NTU
10
NTU
Water Conditions
Weather
Cloudy
Last rainfall
During the last week
Flow estimate
Slow
Water Appearance
Stained brown
Stream depth
0 - 50cm
Stream width
2m - 5m
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Turbidity - NTU
Test 2
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
13-06-2010
09-01-2012
10-02-2012
→
Modal title