Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Broken River Catchment
GB_BRO055
Site visits
17-11-2011
Broken River after Benalla at Pump station in Faithful St.
Goulburn-Broken
DOWNLOAD DATA
GB_BRO055 Broken River Catchment
Thursday 17th November 2011 15:00pm
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
84
%
Dissolved Oxygen mg/L
7.1
mg/L
Electrical Conductivity
110
µS/cm
pH
7.7
pH Units
Temperature - WATER
21.6
° C
Total Phosphorus
0.07
mg/L
Turbidity - NTU
34
NTU
Water Conditions
Weather
Last rainfall
During the last 24 hours
0
Flow estimate
Moderate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
E coli
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Rainfall last 48 hours
Total Coliforms
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
E coli
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Rainfall last 48 hours
Total Coliforms
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
28-10-2011
17-11-2011
15-12-2011
→
Modal title