Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Yarra River Catchment
ME_YDP037
Site visits
10-03-2011
Damper Creek, Eastern branch, below Alvie Hall carpark, 30 metres above confluence with main creek.
Melbourne
DOWNLOAD DATA
ME_YDP037 Yarra River Catchment
Thursday 10th March 2011 10:10am
Approved
Notes
Physical Chemical Tests
Ammonia-Nitrogen
0.01
mg/L NH3-N
Dissolved Oxygen mg/L
8.2
mg/L
Electrical Conductivity
330
µS/cm
pH
6.9
pH Units
Reactive Phosphate (mg/L)
0.01
mg/L P
Temperature - AIR
17.5
° C
Temperature - WATER
18
° C
Turbidity - FTU
10
FTU
Water Conditions
Weather
Cloudy
Last rainfall
Raining Now
Flow estimate
Rapid
Water Appearance
Clear
Stream depth
Stream width
Hazards
Litter/Pollutants
bottles,cans,packets,paper
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Ammonia-Nitrogen
Ammonium
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Nitrate NO3
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - FTU
Turbidity - NTU
Test 2
Ammonia-Nitrogen
Ammonium
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Nitrate NO3
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - FTU
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
12-11-2010
10-03-2011
08-04-2011
→
Modal title