Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Yarra River Catchment
ME_YDP037
Site visits
12-08-2011
Damper Creek, Eastern branch, below Alvie Hall carpark, 30 metres above confluence with main creek.
Melbourne
DOWNLOAD DATA
ME_YDP037 Yarra River Catchment
Friday 12th August 2011 10:30am
Approved
Notes
Physical Chemical Tests
Ammonia-Nitrogen
0.5
mg/L NH3-N
Dissolved Oxygen mg/L
9.6
mg/L
Electrical Conductivity
930
µS/cm
pH
6.9
pH Units
Temperature - AIR
8
° C
Temperature - WATER
9
° C
Water Conditions
Weather
Cloudy
Last rainfall
During the last week
Flow estimate
Rapid
Water Appearance
Muddy
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Ammonia-Nitrogen
Ammonium
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Nitrate NO3
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - FTU
Turbidity - NTU
Test 2
Ammonia-Nitrogen
Ammonium
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Nitrate NO3
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - FTU
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
13-07-2011
12-08-2011
09-09-2011
→
Modal title