Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Bunyip River Catchment
ME_EWA060
Site visits
27-10-2010
Warringine Creek at Carpenters Lane North Bridge
Melbourne
DOWNLOAD DATA
ME_EWA060 Bunyip River Catchment
Wednesday 27th October 2010 9:15am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
2700
µS/cm
pH
7.1
pH Units
Reactive Phosphate (mg/L)
0.07
mg/L P
Temperature - AIR
20.3
° C
Temperature - WATER
13.5
° C
Turbidity - NTU
20
NTU
Water Conditions
Weather
Cloudy
Last rainfall
During the last week
Flow estimate
Slow
Water Appearance
Other: slightly discoloured
Stream depth
0 - 50cm
Stream width
1.8
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Ammonia-Nitrogen
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Ammonia-Nitrogen
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
30-09-2010
27-10-2010
20-11-2010
→
Modal title