Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Bunyip River Catchment
ME_EWA070
Site visits
29-04-2011
Warringine Creek tributary at 5 Carpenters Lane North spring in paddock
Melbourne
DOWNLOAD DATA
ME_EWA070 Bunyip River Catchment
Friday 29th April 2011 12:00pm
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
3300
µS/cm
pH
7.5
pH Units
Reactive Phosphate (mg/L)
0.01
mg/L P
Temperature - AIR
19
° C
Temperature - WATER
12.5
° C
Turbidity - NTU
10
NTU
Water Conditions
Weather
Sunny
Last rainfall
During the last week
Flow estimate
Moderate
Water Appearance
Clear
Stream depth
0 - 50cm
Stream width
1.5
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
29-04-2011
27-05-2011
→
Modal title