Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Lake King Catchment
EG_JOB055
Site visits
15-03-2012
Jones Bay 'FOGL Site"
East Gippsland
DOWNLOAD DATA
EG_JOB055 Lake King Catchment
Thursday 15th March 2012 14:00pm
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
111.4
%
Dissolved Oxygen mg/L
8.47
mg/L
Electrical Conductivity
827
µS/cm
pH
8.8
pH Units
Reactive Phosphate (mg/L)
0.41
mg/L P
Temperature - AIR
28.4
° C
Temperature - WATER
27
° C
Turbidity - NTU
8
NTU
Water Conditions
Weather
Cloudy
Last rainfall
During the last week
Flow estimate
Water Appearance
Clear
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
22-02-2012
15-03-2012
12-04-2012
→
Modal title