Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Bunyip River Catchment
ME_EBI100
Site visits
26-01-2017
Bittern Dam, near dam wall and catch drain
Melbourne
DOWNLOAD DATA
ME_EBI100 Bunyip River Catchment
Thursday 26th January 2017 10:50am
Approved
Notes
Physical Chemical Tests
Ammonium
0
mg/L NH4+
Dissolved Oxygen mg/L
6
mg/L
Electrical Conductivity
1737
µS/cm
Nitrate - Nitrogen
0
mg/L N
pH
9.2
pH Units
Reactive Phosphate (mg/L)
0.1
mg/L P
Temperature - AIR
23
° C
Temperature - WATER
22.8
° C
Turbidity - NTU
9
NTU
Water Conditions
Weather
Raining
Last rainfall
Raining now
1.00
Flow estimate
LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Clear,Foamy/frothy
Stream depth
0 - 50cm
Stream width
Other:250m
Hazards
Litter/Pollutants
Diary photos
Physical Chemical Trends
Loading chart
Test 1
Ammonium
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Ammonium
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
16-12-2016
26-01-2017
21-02-2017
→
Modal title