Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Latrobe River Catchment
WG_HRT515
Site visits
13-07-2016
Heart Morass site @ Levee Bank (West side of road)
West Gippsland
DOWNLOAD DATA
WG_HRT515 Latrobe River Catchment
Wednesday 13th July 2016 15:00pm
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
82
%
Electrical Conductivity
479
µS/cm
pH
6.84
pH Units
Temperature - AIR
4.4
° C
Temperature - WATER
5.59
° C
Turbidity - NTU
23
NTU
Water Conditions
Weather
Sunny
Last rainfall
During the last week
Flow estimate
PERMANENT: wetlands and lakes
Water Appearance
Stained brown
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Gauge Board Height
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Gauge Board Height
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
25-02-2016
13-07-2016
24-08-2016
→
Modal title