Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Yarra River Catchment
ME_YDP037
Site visits
09-01-2015
Damper Creek, Eastern branch, below Alvie Hall carpark, 30 metres above confluence with main creek.
Melbourne
DOWNLOAD DATA
ME_YDP037 Yarra River Catchment
Friday 9th January 2015 10:30am
Approved
Notes
Physical Chemical Tests
Ammonium
0.3
mg/L NH4+
Dissolved Oxygen mg/L
4.6
mg/L
Electrical Conductivity
300
µS/cm
pH
6.7
pH Units
Reactive Phosphate (mg/L)
0.05542
mg/L P
Temperature - AIR
17
° C
Temperature - WATER
19
° C
Turbidity - NTU
23
NTU
Water Conditions
Weather
Overcast
Last rainfall
During the last 24 hours
17
Flow estimate
HIGH: Less than bankfull and in-stream habitats connected
Water Appearance
Clear
Stream depth
Other:Not calculated
Stream width
< 2m
Hazards
Litter/Pollutants
bottles,paper,plastic,waxed cardboard,cans,packets,other: 1 chair
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Ammonia-Nitrogen
Ammonium
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Nitrate NO3
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - FTU
Turbidity - NTU
Test 2
Ammonia-Nitrogen
Ammonium
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Nitrate NO3
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - FTU
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
10-05-2013
09-01-2015
10-04-2015
→
Modal title