Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Mallee Catchment
MA_RMU541
Site visits
03-04-2012
River Murray at Pump Hill boat ramp
Mallee
DOWNLOAD DATA
MA_RMU541 Mallee Catchment
Tuesday 3rd April 2012 9:10am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
174.5
µS/cm
pH
7.12
pH Units
Reactive Phosphate (mg/L)
0.25
mg/L P
Temperature - WATER
12.8
° C
Turbidity - NTU
60
NTU
Water Conditions
Weather
Last rainfall
During the last week
Flow estimate
HIGH - flow is high
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Turbidity - NTU
Test 2
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
08-03-2012
03-04-2012
03-05-2012
→
Modal title