Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Goulburn River Catchment
GB_VPL006
Site visits
12-10-2017
Outlet of Victoria Park Lake to Goulburn River
Goulburn-Broken
DOWNLOAD DATA
GB_VPL006 Goulburn River Catchment
Thursday 12th October 2017 13:28pm
Approved
Notes
Physical Chemical Tests
Chemical Oxygen Demand
16
mg/L
Dissolved Oxygen % Saturation
92.9
%
Dissolved Oxygen mg/L
8.4
mg/L
E coli
1414
orgs/100mL
Electrical Conductivity
286
µS/cm
pH
9.7
pH Units
Rainfall last 48 hours
8
mm
Temperature - WATER
19.1
° C
Total Phosphorus
0.02
mg/L
Turbidity - NTU
0
NTU
Water Conditions
Weather
Last rainfall
Flow estimate
PERMANENT: wetlands and lakes
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Chemical Oxygen Demand
E coli
Dissolved Oxygen mg/L
Rainfall last 48 hours
Total Coliforms
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Chemical Oxygen Demand
E coli
Dissolved Oxygen mg/L
Rainfall last 48 hours
Total Coliforms
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
26-09-2017
12-10-2017
30-11-2017
→
Modal title