Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Goulburn River Catchment
GB_WGS003
Site visits
30-11-2017
Outlet pit of bioremediation basin - Wetland at Gemmills Swamp
Goulburn-Broken
DOWNLOAD DATA
GB_WGS003 Goulburn River Catchment
Thursday 30th November 2017 11:15am
Approved
Notes
Physical Chemical Tests
Chemical Oxygen Demand
50
mg/L
Dissolved Oxygen % Saturation
16.64
%
Dissolved Oxygen mg/L
1.4
mg/L
E coli
65
orgs/100mL
Electrical Conductivity
114
µS/cm
pH
6.25
pH Units
Rainfall last 48 hours
0
mm
Temperature - WATER
24
° C
Total Coliforms
2420
orgs/100mL
Total Phosphorus
0.45
mg/L
Turbidity - NTU
21.9
NTU
Water Conditions
Weather
Last rainfall
Flow estimate
LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Chemical Oxygen Demand
E coli
Dissolved Oxygen mg/L
Rainfall last 48 hours
Total Coliforms
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Chemical Oxygen Demand
E coli
Dissolved Oxygen mg/L
Rainfall last 48 hours
Total Coliforms
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
12-10-2017
30-11-2017
13-12-2017
→
Modal title