Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Campaspe River Catchment
NC_FMC450
Site visits
02-11-2017
Five Mile Creek, High St Woodend
North Central
DOWNLOAD DATA
NC_FMC450 Campaspe River Catchment
Thursday 2nd November 2017 14:30pm
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
463
µS/cm
pH
7
pH Units
Reactive Phosphate (mg/L)
0.05
mg/L P
Temperature - AIR
15.8
° C
Temperature - WATER
12
° C
Turbidity - NTU
14
NTU
Water Conditions
Weather
Overcast
Last rainfall
During the last week
6.00
Flow estimate
HIGH: Less than bankfull and in-stream habitats connected
Water Appearance
Clear,Stained brown
Stream depth
2m
Stream width
> 5m
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
01-10-2017
02-11-2017
01-01-2018
→
Modal title