Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Broken River Catchment
GB_HOL020
Site visits
30-04-2018
Holland Creek at Sherwills Bridge Benalla
Goulburn-Broken
DOWNLOAD DATA
GB_HOL020 Broken River Catchment
Monday 30th April 2018 12:50pm
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
35.4
%
Dissolved Oxygen mg/L
3.48
mg/L
Electrical Conductivity
179
µS/cm
pH
6.63
pH Units
Rainfall last 48 hours
0
mm
Temperature - WATER
14.6
° C
Turbidity - NTU
91.3
NTU
Water Conditions
Weather
Last rainfall
Flow estimate
LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Rainfall last 48 hours
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Rainfall last 48 hours
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
07-10-2017
30-04-2018
→
Modal title