Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Campaspe River Catchment
NC_FMC450
Site visits
04-08-2018
Five Mile Creek, High St Woodend
North Central
DOWNLOAD DATA
NC_FMC450 Campaspe River Catchment
Saturday 4th August 2018 12:00pm
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
335
µS/cm
pH
7.2
pH Units
Reactive Phosphate (mg/L)
0.01
mg/L P
Temperature - AIR
7
° C
Temperature - WATER
6.5
° C
Turbidity - NTU
32
NTU
Water Conditions
Weather
Overcast
Last rainfall
During the last 24 hours
17.00
Flow estimate
BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance
Stained brown
Stream depth
2m
Stream width
> 5m
Hazards
Litter/Pollutants
Diary photos
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
01-07-2018
04-08-2018
08-09-2018
→
Modal title