Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Yarra River Catchment
ME_YFM980
Site visits
01-09-2018
Five Mile Creek, end of Governors Road, Essendon
Melbourne
DOWNLOAD DATA
ME_YFM980 Yarra River Catchment
Saturday 1st September 2018 10:10am
Approved
Notes
Physical Chemical Tests
Ammonium
0
mg/L NH4+
Dissolved Oxygen mg/L
7
mg/L
Electrical Conductivity
210
µS/cm
pH
6.1
pH Units
Reactive Phosphate (mg/L)
0.065
mg/L P
Temperature - AIR
14.1
° C
Temperature - WATER
12
° C
Turbidity - NTU
11
NTU
Water Conditions
Weather
Overcast
Last rainfall
During the last 24 hours
1.40
Flow estimate
Water Appearance
Clear,Milky
Stream depth
0 - 50cm
Stream width
< 2m
Hazards
Litter/Pollutants
bottles,paper,plastic,waxed cardboard,cans,clothing,packets
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Ammonium
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Ammonium
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
07-07-2018
01-09-2018
07-10-2018
→
Modal title