Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Yarra River Catchment
ME_YFM980
Site visits
17-11-2018
Five Mile Creek, end of Governors Road, Essendon
Melbourne
DOWNLOAD DATA
ME_YFM980 Yarra River Catchment
Saturday 17th November 2018 10:40am
Approved
Notes
Physical Chemical Tests
Ammonium
0
mg/L NH4+
Dissolved Oxygen mg/L
10
mg/L
Electrical Conductivity
300
µS/cm
pH
7.4
pH Units
Reactive Phosphate (mg/L)
0.04
mg/L P
Temperature - AIR
18
° C
Temperature - WATER
15
° C
Turbidity - NTU
10
NTU
Water Conditions
Weather
Sunny
Last rainfall
During the last week
0.00
Flow estimate
MEDIUM: flow is normal/typical average flow
Water Appearance
Clear
Stream depth
0 - 50cm
Stream width
< 2m
Hazards
none
Litter/Pollutants
bottles,plastic
Water Bugs
WaterWatch method
Image
Species
Score
Quantity
Segmented Worm (Oligochaeta)
1
1
Total bug score
Total abundance
0 - 35
35+
0 - 200
Poor
Good
200+
Fair
Very good
Total abundance: 1
Total score: 1
Overall rating: Poor
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Ammonium
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Ammonium
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
07-10-2018
17-11-2018
16-02-2019
→
Modal title