Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Campaspe River Catchment
NC_FMC450
Site visits
01-02-2019
Five Mile Creek, High St Woodend
North Central
DOWNLOAD DATA
NC_FMC450 Campaspe River Catchment
Friday 1st February 2019 15:30pm
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
455
µS/cm
pH
7.2
pH Units
Reactive Phosphate (mg/L)
0.07
mg/L P
Temperature - AIR
22
° C
Temperature - WATER
20
° C
Turbidity - NTU
14.5
NTU
Water Conditions
Weather
Sunny
Last rainfall
During the last 24 hours
6.50
Flow estimate
LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stained brown
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
05-01-2019
01-02-2019
02-03-2019
→
Modal title