Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Loddon River Catchment
NC_CRO900
Site visits
12-08-2019
Jim Crow Creek upstream from Garsed Road crossing
North Central
DOWNLOAD DATA
NC_CRO900 Loddon River Catchment
Monday 12th August 2019 10:00am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
130
µS/cm
pH
7.2
pH Units
Reactive Phosphate (mg/L)
0.01
mg/L P
Temperature - AIR
12.4
° C
Temperature - WATER
9.2
° C
Turbidity - NTU
33
NTU
Water Conditions
Weather
Sunny
Last rainfall
During the last week
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Turbidity - NTU
Test 2
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
01-07-2019
12-08-2019
09-09-2019
→
Modal title