Skip to content
 
WaterWatch Data Portal

ME_EBI200 Bunyip River Catchment

Tuesday 27th August 2019 11:00am Approved
Notes

Physical Chemical Tests

Ammonium
0mg/L NH4+
Dissolved Oxygen % Saturation
76.6%
Dissolved Oxygen mg/L
8mg/L
Electrical Conductivity
1360µS/cm
pH
8.5pH Units
Reactive Phosphate (mg/L)
0mg/L P
Temperature - AIR
12° C
Temperature - WATER
13.2° C
Turbidity - NTU
20NTU

Water Conditions

Weather
Cloudy
Last rainfall
During the last 24 hours 8.00
Flow estimate
BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance
Muddy
Stream depth
0 - 50cm
Stream width
> 5m
Hazards
none . normal caution required
Litter/Pollutants
 

Diary photos

Physical Chemical Trends

Last data: