Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Yarra River Catchment
ME_YFM980
Site visits
26-09-2019
Five Mile Creek, end of Governors Road, Essendon
Melbourne
DOWNLOAD DATA
ME_YFM980 Yarra River Catchment
Thursday 26th September 2019 15:05pm
Approved
Notes
Physical Chemical Tests
Ammonium
0
mg/L NH4+
Dissolved Oxygen mg/L
1
mg/L
Electrical Conductivity
200
µS/cm
pH
8.6
pH Units
Reactive Phosphate (mg/L)
0.07
mg/L P
Temperature - AIR
23.5
° C
Temperature - WATER
15
° C
Turbidity - NTU
39
NTU
Water Conditions
Weather
Sunny
Last rainfall
During the last 24 hours
1.00
Flow estimate
MEDIUM: flow is normal/typical average flow
Water Appearance
Muddy
Stream depth
0 - 50cm
Stream width
< 2m
Hazards
Litter/Pollutants
bottles,plastic,cans,packets,other: Foil
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Ammonium
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Ammonium
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
25-08-2019
26-09-2019
22-10-2019
→
Modal title