Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Campaspe River Catchment
NC_FMC450
Site visits
04-08-2019
Five Mile Creek, High St Woodend
North Central
DOWNLOAD DATA
NC_FMC450 Campaspe River Catchment
Sunday 4th August 2019 13:06pm
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
376
µS/cm
pH
7.2
pH Units
Reactive Phosphate (mg/L)
0.02
mg/L P
Temperature - AIR
16
° C
Temperature - WATER
9
° C
Turbidity - NTU
9
NTU
Water Conditions
Weather
Sunny
Last rainfall
During the last 24 hours
7.00
Flow estimate
BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance
Clear
Stream depth
2m
Stream width
> 5m
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
07-07-2019
04-08-2019
04-10-2019
→
Modal title