Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Yarra River Catchment
ME_YFM980
Site visits
23-11-2019
Five Mile Creek, end of Governors Road, Essendon
Melbourne
DOWNLOAD DATA
ME_YFM980 Yarra River Catchment
Saturday 23rd November 2019 10:15am
Approved
Notes
Physical Chemical Tests
Ammonium
0
mg/L NH4+
Dissolved Oxygen mg/L
4
mg/L
Electrical Conductivity
660
µS/cm
pH
8.4
pH Units
Reactive Phosphate (mg/L)
0.1
mg/L P
Temperature - AIR
20
° C
Temperature - WATER
16
° C
Turbidity - NTU
15
NTU
Water Conditions
Weather
Sunny
Last rainfall
During the last week
1.00
Flow estimate
LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Clear
Stream depth
0 - 50cm
Stream width
< 2m
Hazards
Litter/Pollutants
bottles,plastic,cans,packets
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Ammonium
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Ammonium
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
22-10-2019
23-11-2019
15-01-2020
→
Modal title