Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Yarra River Catchment
ME_YFI300
Site visits
21-07-2020
Findon Creek, before joining with Darebin Creek, crossing over Hayston Boulevard, Epping North
Melbourne
DOWNLOAD DATA
ME_YFI300 Yarra River Catchment
Tuesday 21st July 2020 15:45pm
Approved
Notes
Physical Chemical Tests
Ammonium
0.02
mg/L NH4+
Dissolved Oxygen % Saturation
55.35
%
Dissolved Oxygen mg/L
6
mg/L
Electrical Conductivity
1720
µS/cm
pH
8
pH Units
Reactive Phosphate (mg/L)
0.07
mg/L P
Temperature - AIR
11.5
° C
Temperature - WATER
11.5
° C
Turbidity - NTU
11
NTU
Water Conditions
Weather
Cloudy
Last rainfall
During the last 24 hours
0.00
Flow estimate
LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stained brown
Stream depth
51cm - 99cm
Stream width
< 2m
Hazards
Litter/Pollutants
plastic,packets,other: Dumped rubbish
Diary photos
Physical Chemical Trends
Loading chart
Test 1
Ammonium
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Ammonium
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
18-06-2020
21-07-2020
→
Modal title