Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Latrobe River Catchment
WG_HRT515
Site visits
02-03-2019
Heart Morass site @ Levee Bank (West side of road)
West Gippsland
DOWNLOAD DATA
WG_HRT515 Latrobe River Catchment
Saturday 2nd March 2019 8:20am
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
14.41
%
Dissolved Oxygen mg/L
1.19
mg/L
Electrical Conductivity
12050
µS/cm
pH
6.7
pH Units
Temperature - AIR
19.5
° C
Temperature - WATER
22.9
° C
Turbidity - NTU
80
NTU
Water Conditions
Weather
Last rainfall
Flow estimate
Water Appearance
Scummy
Stream depth
0 - 50cm
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Gauge Board Height
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Gauge Board Height
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
11-02-2019
02-03-2019
02-04-2019
→
Modal title