Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Latrobe River Catchment
WG_HRT515
Site visits
03-09-2019
Heart Morass site @ Levee Bank (West side of road)
West Gippsland
DOWNLOAD DATA
WG_HRT515 Latrobe River Catchment
Tuesday 3rd September 2019 9:40am
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
92.46
%
Dissolved Oxygen mg/L
9.51
mg/L
Electrical Conductivity
3934
µS/cm
pH
6.3
pH Units
Temperature - AIR
14
° C
Temperature - WATER
13.5
° C
Turbidity - NTU
60
NTU
Water Conditions
Weather
Last rainfall
Flow estimate
Water Appearance
Scummy
Stream depth
51cm - 99cm
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Gauge Board Height
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Gauge Board Height
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
05-08-2019
03-09-2019
01-10-2019
→
Modal title