Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Broken River Catchment
GB_SNY003
Site visits
03-12-2019
Stoney Creek at boundary to Lima Pine Plantation
Goulburn-Broken
DOWNLOAD DATA
GB_SNY003 Broken River Catchment
Tuesday 3rd December 2019 14:30pm
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
100
µS/cm
pH
7.6
pH Units
Rainfall last 48 hours
43.5
mm
Temperature - WATER
15.2
° C
Turbidity - NTU
11.5
NTU
Water Conditions
Weather
Cloudy
Last rainfall
During the last week
43.50
Flow estimate
LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Clear
Stream depth
0 - 50cm
Stream width
< 2m
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Rainfall last 48 hours
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Turbidity - NTU
Test 2
Rainfall last 48 hours
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
03-11-2019
03-12-2019
05-01-2020
→
Modal title