Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Loddon River Catchment
NC_BUL295
Site visits
07-11-2021
Bullock Creek - Malone Park Road bridge, Marong
North Central
DOWNLOAD DATA
NC_BUL295 Loddon River Catchment
Sunday 7th November 2021 12:40pm
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
1278
µS/cm
pH
6.8
pH Units
Reactive Phosphate (mg/L)
0.07
mg/L P
Temperature - AIR
19.5
° C
Temperature - WATER
20.4
° C
Water Conditions
Weather
Overcast
Last rainfall
During the last week
58.00
Flow estimate
MEDIUM: flow is normal/typical average flow
Water Appearance
Clear
Stream depth
1m - 2m
Stream width
2m - 5m
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
14-10-2021
07-11-2021
20-03-2022
→
Modal title