Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Bunyip River Catchment
ME_EBA800
Site visits
05-06-2022
Balcombe Creek at the footbridge as it exits The Briar's Park, Mt Martha
Melbourne
DOWNLOAD DATA
ME_EBA800 Bunyip River Catchment
Sunday 5th June 2022 9:50am
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
71.91
%
Dissolved Oxygen mg/L
8
mg/L
Electrical Conductivity
890
µS/cm
pH
6.4
pH Units
Reactive Phosphate (mg/L)
0.025
mg/L P
Temperature - AIR
13
° C
Temperature - WATER
10.5
° C
Turbidity - NTU
10
NTU
Water Conditions
Weather
Overcast
Last rainfall
During the last 24 hours
Flow estimate
BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance
Clear
Stream depth
0 - 50cm
Stream width
Other:6m
Hazards
Litter/Pollutants
Diary photos
Physical Chemical Trends
Loading chart
Test 1
Ammonia-Nitrogen
Ammonium
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Ammonia-Nitrogen
Ammonium
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
01-05-2022
05-06-2022
03-07-2022
→
Modal title