Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Latrobe River Catchment
WG_HRT515
Site visits
20-06-2022
Heart Morass site @ Levee Bank (West side of road)
West Gippsland
DOWNLOAD DATA
WG_HRT515 Latrobe River Catchment
Monday 20th June 2022 12:05pm
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
59.2
%
Dissolved Oxygen mg/L
6.74
mg/L
Electrical Conductivity
377.6
µS/cm
pH
7.1
pH Units
Temperature - WATER
10.4
° C
Turbidity - NTU
22
NTU
Water Conditions
Weather
Last rainfall
During the last week
Flow estimate
Water Appearance
Scummy,Stained brown
Stream depth
51cm - 99cm
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Gauge Board Height
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Gauge Board Height
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
02-05-2022
20-06-2022
22-07-2022
→
Modal title