Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Bunyip River Catchment
ME_EBI100
Site visits
25-10-2022
Bittern Dam, near dam wall and catch drain
Melbourne
DOWNLOAD DATA
ME_EBI100 Bunyip River Catchment
Tuesday 25th October 2022 10:44am
Approved
Notes
Physical Chemical Tests
Ammonium
0
mg/L NH4+
Dissolved Oxygen % Saturation
60.97
%
Dissolved Oxygen mg/L
6
mg/L
Electrical Conductivity
1640
µS/cm
pH
7.5
pH Units
Reactive Phosphate (mg/L)
0
mg/L P
Temperature - AIR
22
° C
Temperature - WATER
15.9
° C
Turbidity - NTU
9
NTU
Water Conditions
Weather
Cloudy
Last rainfall
During the last 24 hours
15.00
Flow estimate
FLOOD / OVERBANK: flow is high and water level has exceeded bank capacity and is connecting with floodplain
Water Appearance
Clear
Stream depth
1m - 2m
Stream width
> 5m
Hazards
slippery banks soft mud
Litter/Pollutants
Diary photos
Physical Chemical Trends
Loading chart
Test 1
Ammonium
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Ammonium
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
11-10-2022
25-10-2022
17-11-2022
→
Modal title