Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Latrobe River Catchment
WG_HRT515
Site visits
10-10-2022
Heart Morass site @ Levee Bank (West side of road)
West Gippsland
DOWNLOAD DATA
WG_HRT515 Latrobe River Catchment
Monday 10th October 2022 11:25am
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
80.5
%
Dissolved Oxygen mg/L
8.32
mg/L
Electrical Conductivity
654
µS/cm
pH
6.8
pH Units
Temperature - WATER
14.7
° C
Turbidity - NTU
42
NTU
Water Conditions
Weather
Last rainfall
During the last week
20.00
Flow estimate
Water Appearance
Muddy
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Gauge Board Height
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Gauge Board Height
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
08-09-2022
10-10-2022
10-01-2023
→
Modal title