Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Campaspe River Catchment
NC_EMU955
Site visits
30-04-2022
Emu creek near corner Sullivans Rd & Dukes Lane
North Central
DOWNLOAD DATA
NC_EMU955 Campaspe River Catchment
Saturday 30th April 2022 12:00pm
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
268
µS/cm
pH
7.2
pH Units
Reactive Phosphate (mg/L)
0.03
mg/L P
Temperature - AIR
14.6
° C
Temperature - WATER
17.6
° C
Turbidity - NTU
35
NTU
Water Conditions
Weather
Sunny
Last rainfall
During the last 24 hours
90.20
Flow estimate
LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stained brown
Stream depth
Stream width
Other:11
Hazards
Moderate
Litter/Pollutants
Diary photos
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
31-03-2022
30-04-2022
07-06-2022
→
Modal title