Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Lake Victoria Catchment
EG_FOR030
Site visits
26-09-2022
Forge Creek, rock chute - Site 1
East Gippsland
DOWNLOAD DATA
EG_FOR030 Lake Victoria Catchment
Monday 26th September 2022 8:30am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
250
µS/cm
pH
7.7
pH Units
Reactive Phosphate (mg/L)
0.03
mg/L P
Temperature - AIR
13.3
° C
Temperature - WATER
12.3
° C
Turbidity - NTU
9
NTU
Water Conditions
Weather
Overcast
Last rainfall
During the last week
20.00
Flow estimate
POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance
Clear
Stream depth
1m - 2m
Stream width
2m - 5m
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - FTU
Turbidity - NTU
Test 2
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - FTU
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
01-09-2022
26-09-2022
29-10-2022
→
Modal title