Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Latrobe River Catchment
WG_HRT515
Site visits
08-02-2023
Heart Morass site @ Levee Bank (West side of road)
West Gippsland
DOWNLOAD DATA
WG_HRT515 Latrobe River Catchment
Wednesday 8th February 2023 12:35pm
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
58.03
%
Dissolved Oxygen mg/L
5.08
mg/L
Electrical Conductivity
275.4
µS/cm
pH
7.2
pH Units
Temperature - WATER
21.9
° C
Turbidity - NTU
14
NTU
Water Conditions
Weather
Cloudy
Last rainfall
During the last week
3.00
Flow estimate
Water Appearance
Stained green
Stream depth
1m - 2m
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Gauge Board Height
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Gauge Board Height
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
10-01-2023
08-02-2023
13-03-2023
→
Modal title