Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Bunyip River Catchment
ME_EBA800
Site visits
02-04-2023
Balcombe Creek at the footbridge as it exits The Briar's Park, Mt Martha
Melbourne
DOWNLOAD DATA
ME_EBA800 Bunyip River Catchment
Sunday 2nd April 2023 10:45am
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
67.09
%
Dissolved Oxygen mg/L
7
mg/L
Electrical Conductivity
970
µS/cm
pH
7
pH Units
Reactive Phosphate (mg/L)
0.05
mg/L P
Temperature - AIR
15.4
° C
Temperature - WATER
13.3
° C
Turbidity - NTU
5
NTU
Water Conditions
Weather
Cloudy
Last rainfall
During the last 24 hours
Flow estimate
MEDIUM: flow is normal/typical average flow
Water Appearance
Clear
Stream depth
Other:0.3
Stream width
Other:5
Hazards
Litter/Pollutants
Diary photos
Physical Chemical Trends
Loading chart
Test 1
Ammonia-Nitrogen
Ammonium
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Ammonia-Nitrogen
Ammonium
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
05-03-2023
02-04-2023
14-05-2023
→
Modal title