Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Mallee Catchment
MA_CSA200
Site visits
27-07-2023
Site C (7th Tee) Sandilong Creek
Mallee
DOWNLOAD DATA
MA_CSA200 Mallee Catchment
Thursday 27th July 2023 14:25pm
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen mg/L
0.16
mg/L
Electrical Conductivity
494
µS/cm
pH
8.28
pH Units
Temperature - WATER
13.4
° C
Total Dissolved Solids
321
mg/L
Turbidity - NTU
8.3
NTU
Water Conditions
Weather
Cloudy
Last rainfall
During the last week
0.80
Flow estimate
Water Appearance
Muddy
Stream depth
51cm - 99cm
Stream width
> 5m
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Total Dissolved Solids
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Total Dissolved Solids
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
30-06-2023
27-07-2023
05-01-2024
→
Modal title